What your BNG package includes
A complete BNG assessment typically includes:
- Baseline habitat survey
- Habitat classification using DEFRA metrics
- Biodiversity unit calculations
- On‑site and off‑site mitigation strategy
- Habitat enhancement proposals
- Planting and landscaping recommendations
- Long‑term management plan
- Full BNG report for planning submission
- Coordination with ecologists (if required)
All reports follow DEFRA’s statutory BNG metric and local authority requirements.
Our process
A structured, planning‑ready workflow:
- Site review We assess existing habitats, vegetation, and ecological constraints.
- Baseline biodiversity calculation We calculate current biodiversity units using DEFRA metrics.
- Mitigation and enhancement strategy We propose habitat improvements to achieve required net gain.
- BNG report preparation A full planning‑ready report is produced with all calculations.
- Submission & liaison We provide the BNG report to your architect or submit it with your planning application.
Fees
Typical fees start from:
- £495–£995 for small residential sites
- £995–£1895 for new builds or multi‑unit developments
- £1895+ for complex or ecologically sensitive sites
A fixed quote is provided after reviewing your site and drawings.
Borough‑specific considerations
BNG requirements vary between councils. We specialise in:
- London boroughs — strict urban greening and habitat enhancement policies
- Kensington & Chelsea — limited green space, high scrutiny on planting
- Westminster — urban greening factor (UGF) integration
- Camden — biodiversity corridors and ecological connectivity
- Lancashire authorities — rural habitat protection and enhancement
- Conservation areas — sensitive planting and habitat retention
Your BNG strategy is tailored to your borough’s ecological policies.
Common mistakes to avoid
Applications are often delayed or refused when:
- No BNG assessment is submitted
- The BNG report uses outdated DEFRA metrics
- Habitat calculations are incorrect
- Mitigation measures are unrealistic or uncosted
- Landscaping plans don’t align with BNG requirements
- Developers assume small sites are exempt
Planning World ensures your BNG submission is compliant, accurate, and planning‑ready.