Skip to main contentSkip to footer

Build Over Agreements

Approval to build safely over or near public sewers
People Trust Planning World
Average 5-Star Reviews

Planning World

A faster, smarter, more affordable way to get planning permission anywhere in the UK.

A Build Over Agreement is required when your extension, outbuilding, or structural works are close to, or directly above, a public sewer. Water authorities must confirm that your construction will not damage, obstruct, or restrict access to their drainage network.

Planning World prepares complete Build Over Agreement packages — drainage drawings, CCTV surveys, structural details, and water authority forms — ready for submission and approval.

When you need a Build Over Agreement

A Build Over Agreement is required when you plan to build:

  • Over or within 3 metres of a public sewer
  • Over shared drains serving more than one property
  • Over manholes, inspection chambers, or junctions
  • Extensions (single or double storey)
  • Rear or side infills
  • Garage conversions with new foundations
  • Garden rooms with services
  • New builds and annexes
  • Basements or underpinning near drainage runs

Even small extensions often require approval if the sewer is public, shallow, or located beneath proposed foundations.

For Build Over Agreement

What your Build Over Agreement package includes

A complete Build Over Agreement submission typically includes:

  • Drainage layout drawings (existing & proposed)
  • Sewer location mapping using water authority records – *waterboard fees may apply
  • Manhole relocation or sealing details
  • Foundation design to protect the sewer
  • Section drawings showing clearance distances
  • Method statements for safe construction
  • Water authority application forms completed
  • Liaison with Thames Water, United Utilities, Severn Trent, Anglian Water, etc.

All documents are produced to water authority standards and accepted nationwide.

Our process

A clear, coordinated workflow from start to approval:

  1. Review of plans & sewer records We identify sewer positions, depths, and risk factors.
  2. Build Over drawings Plans, sections, and foundation details are prepared.
  3. Application preparation All forms, drawings, and supporting documents are compiled.
  4. Submission & liaison We submit to the water authority and respond to any queries.

Fees

Typical fees start from:

  • £295–£495 for simple Build Over submissions
  • £495–£895 for extensions requiring structural details
  • £895+ for complex drainage diversions or deep sewers

A fixed quote is provided after reviewing your drawings and sewer records.

Borough & water authority considerations

While Build Over rules are national, each authority has its own scrutiny points:

  • Thames Water — strict on manhole relocation and deep sewers
  • United Utilities — detailed structural protection requirements
  • Severn Trent — CCTV surveys often mandatory
  • Anglian Water — careful review of clay pipe protection
  • London boroughs — high density of shared Victorian drains
  • Manchester & Lancashire — frequent shallow shared sewers
  • Kensington & Chelsea — basement works require enhanced drainage protection

Your package is tailored to your authority, sewer type, and construction method.

Common mistakes to avoid

Applications are often delayed or rejected when:

  • Sewer location is incorrect or unverified
  • Drawings lack foundation or bridging details
  • Manholes are left beneath extensions
  • Builders rely on planning drawings instead of technical drainage drawings

Planning World eliminates these risks with a fully compliant, coordinated submission.

Positive Feedback
5-day Turnaround
Fixed Pricing From

Why choose Planning World

    • Complete Build Over Agreement packages
    • Drainage, structural, and foundation integration
    • Revit-based technical drawings for accuracy
    • Fast turnaround for urgent applications
    • Accepted by all UK water authorities
    • Clear communication with your builder and water authority

No — only public sewers require approval.

We check water authority maps and confirm via survey if needed.

If your project affects structure, yes.

Usually no — it must be relocated or redesigned.

Ready to secure your Build Over Agreement?

Book a consultation and we’ll review your drawings, confirm sewer locations, and prepare a fully compliant Build Over Agreement package.

Ready to secure your Build Over Agreement?

Book a consultation and we’ll review your drawings, confirm sewer locations, and prepare a fully compliant Build Over Agreement package.